What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE FRAME GOUGED AT BS 700, AT LBL 60. REPLACED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE FRAME GOUGED AT BS 700, AT LBL 60. REPLACED PER BOEING SRM.