What was found
DURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CORROSION AT BS 940 TO 947, LBL 17. CUT OUT AND SPLICED IN REPAIR PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CORROSION AT BS 940 TO 947, LBL 17. CUT OUT AND SPLICED IN REPAIR PER BOEING SRM.