What was found
DURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CORROSION AT BS 787 TO 847, LBL 3. REPLACED SECTION PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CORROSION AT BS 787 TO 847, LBL 3. REPLACED SECTION PER BOEING SRM.