What was found
DURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CORROSION AT BS 328, ON FWD FLANGE. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FLOORBEAM CORROSION AT BS 328, ON FWD FLANGE. REPAIRED PER BOEING SRM.