What was found
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION ON FWD FLANGE TOP SIDE OF FLOORBEAM BS 328, RBL 42,5. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION ON FWD FLANGE TOP SIDE OF FLOORBEAM BS 328, RBL 42,5. REPAIRED PER BOEING SRM.