What was found
DURING SCHEDULED D-CHECK, FOUND BS 344 FLOORBEAM HAS SURFACE CORROSION ON TOP SIDE AND BOTTOM SIDE OF UPPER CHORD BL 0, RBL 1.5, LBL 7, WL 208. BLENDED CORROSION REMOVED SECTION THAT WAS OUT OF LIMITS, FABRICATED REPAIR PARTS, ALODINED AND PRIMED AND INSTALLED. ALL WORK DONE PER SRM.