What was found
DURING SCHEDULED D-CHECK, FOUND CRACK ON VERTICAL STIFFENER BS 663 BULKHEAD, WL 178, RBL 6. REPLACED PART PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CRACK ON VERTICAL STIFFENER BS 663 BULKHEAD, WL 178, RBL 6. REPLACED PART PER SRM.