What was found
DURING SCHEDULED 1/4D CHECK, FOUND CORROSION ON FLOORBEAM, BS 794, RBL 5. REPAIRED PER SWA RA NR1-353-2028.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND CORROSION ON FLOORBEAM, BS 794, RBL 5. REPAIRED PER SWA RA NR1-353-2028.