What was found
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION ON FRAME AT BS 1016, WL 192, RT SIDE. REPAIRED FRAME PER EO 99-532P.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION ON FRAME AT BS 1016, WL 192, RT SIDE. REPAIRED FRAME PER EO 99-532P.