What was found
DURING SCHEDULED D CHECK, FOUND AFT CARGO COMP FLOORBEAM CORRODED, BS 859,LBL 3.5 AND LBL 7.5. REPAIRED FLOORBEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND AFT CARGO COMP FLOORBEAM CORRODED, BS 859,LBL 3.5 AND LBL 7.5. REPAIRED FLOORBEAM PER SRM.