What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE SHEAR TIE CRACKED, BS 420, RBL 74. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE SHEAR TIE CRACKED, BS 420, RBL 74. REMOVED AND REPLACED SHEAR TIE PER SRM.