What was found
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE CENTER SECTION, BS 616, RBL 60 RIB ASSY CRACKED. REPAIRED RIB SECTION PER TI-153-018.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FUSELAGE CENTER SECTION, BS 616, RBL 60 RIB ASSY CRACKED. REPAIRED RIB SECTION PER TI-153-018.