What was found
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION AT FLOOR BEAM, BS 986.5, LBL 16 - LBL 60. REPAIRED BEAM PER TI-453-037.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CORROSION AT FLOOR BEAM, BS 986.5, LBL 16 - LBL 60. REPAIRED BEAM PER TI-453-037.