What was found
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED, BS 312, RBL 6. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED, BS 312, RBL 6. REPAIRED BEAM PER SRM.