What was found
DURING SCHEDULED D CHECK, FOUND CRACKED FUSELAGE FRAME, BS 440, WL 166 AND WL 170. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND CRACKED FUSELAGE FRAME, BS 440, WL 166 AND WL 170. REPAIRED FRAME PER SRM.