What was found
DURING SCHEDULED 1/4D CHECK, FOUND BS 794 FLOORBEAM CORRODED, RBL 8. REPAIRED BEAM PER SWA RA NR 1-353-2182.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND BS 794 FLOORBEAM CORRODED, RBL 8. REPAIRED BEAM PER SWA RA NR 1-353-2182.