What was found
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM UPPER SURFACE CORRODED, BS 986, LBL 45 TO RBL 45. REPAIRED FLOORBEAM PER RE NR 99-6451.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM UPPER SURFACE CORRODED, BS 986, LBL 45 TO RBL 45. REPAIRED FLOORBEAM PER RE NR 99-6451.