What was found
R/H FLOOR BEAM AT RBL9 BETWEEN FS394.00 TO FS409.00+128 SEVERAL AREAS HAS CORROSION (MARKED) (C-CHECK RO 1/24/2024) R/H FLOOR BEAM AT RBL 9 BETWEEN FS 409.00+5 AND FS 409.00+118 FOUND TO BE BEYOND LIMITS IAW CRJ 200 SRM 53-00-00 AND GENERIC REO 601R-53-00-005 REV.-B, DATED 2011/01/06 FIG. 1 DETAIL A. R/H FLOOR BEAM AT RBL 9 BETWEEN FS 409.00+5 AND FS 409.00+118, REPLACED WITH NEW PART, P/N 601R31117-47S, IAW CRJ 200 SRM 51-42-21, CRJ 200 SRM 51-42-34, CRJ 200 SRM 51-42-22 AND REO 601R-53-31-1293 REV.--, DATED 2023-11-18 AND REFERENCE DWG 601R31024 REV. D. ALL STEPS 1 THRU 5 OF REO 601R-53-31-1293 REV.--, DATED 2023-11-18 ACCOMPLISHED AND COMPLIED WITH. SEE CONTINUATION CARD FOR DETAILS. SKYWEST TASK CARD 51-900-1003-SKY(CL600-2B19) STRUCTURAL MAJOR REPAIR (RII), AND MAJOR REPAIR FORM (M-337) COMPLIED WITH.