Service difficulty report · Fitting · Cndair CL6002C10

Difficulty date
August 22, 2024
Submitted
November 12, 2024
Operation
Air carrier
Aircraft
N720EV
Make and model
Cndair CL6002C10
Aircraft serial
10115
Aircraft time
42,733 hours, 31,466 cycles
Part
Fitting
Condition
Damaged
Location
Zone 500 Flap
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

L/H I/B FLAP- I/B WING LUG FITTING- CENTER INBOARD LUG IS DAMAGED (ROLLED METAL) (C-CHECK RO 10/28/2024) (FILED CLOSED)EVALUATED AND REPAIRED DAMAGE ON LH INBD FLAP-INBD WING LUG FITTING-CENTER INBD LUG IAW CRJ700 SRM 57-21-27, 51-12-00. NDT PERFORMED BY BARON NDT LLC, FAA CRS# 5NDR545D, REPORT# S090924-2, P.O# 173559, DATE OF INSPECTION 09SEP2024. SEE REPORT FOR DETAILS. FOUND TO BE STRUCTURALLY ACCEPTABLE IAW REO 670-57-21-993 REV-- DATE 2024-09-09. ROTO PEENED REWORKED AREA IAW REO 670-57-21-993 REV-- DATE 2024-09-09. APPLIED ALODINE PRIMER AND TOPCOAT IAW REO 670-57-21-993 REV-- DATE 2024-09-09. TOOLS USED ROTO PEEN KIT TOOL ID FSA0045 CAL. DUE:JAN.2025 DIGITAL CALIPER TOOL ID: AV-7806 CAL. DUE: AUG.2025 DEPTH GAUGE TOOL ID: AJ-1511 CAL. DUE: FEB.2025