As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
CROSSBEAM HAS CORROSION BETWEEN RBL9 AND LBL9 AT FS549.00 (MARKED) (C-CHECK RO 11/22/2025)WET INSTALLED ALL FASTENERS THRU ENTIRE STACKUP INCLUDING CROSS-BEAM AND FLOOR BEAM. INSTALLED ALL REPAIR PARTS,-1 AND -2 REPAIR ANGLE, -3 AND -4 CLEAT, -5 FILLER, -6 -7 AND -8 SHIM ON FLOOR BEAM REPAIR AT FS549 BETWEEN RBL9 AND LBL9 REF REO 670-53-31-1085 REV-- DATED 2025-09-17. COMPLIED WITH SKY WEST TASK CARD 51-900-1002-SKY (CL600-2C10) STRUCTURAL MAJOR REPAIR