What was found
NR 1 NP GAUGE FLUCTUATES. RETURNED TO SBA. INSTALLED SERVICEABLE NP INDICATOR. RAN ENGINE IAW 71-00-00. GROUND OPS CHECKS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 1 NP GAUGE FLUCTUATES. RETURNED TO SBA. INSTALLED SERVICEABLE NP INDICATOR. RAN ENGINE IAW 71-00-00. GROUND OPS CHECKS GOOD.