What was found
FUSELAGE FLOORBEAM TO TRANSVERSE BEAM ATTACH CLIPS ARE CRACKED IB AND OB; FS 280.00 RBL 9.0. (ITEM FOUND AT C-CHECK INSPECTION.) CLIPS REPLACED IAW CRJ SRM 51-40-11, 51-42-06, 51-23-00, 51-42-21, 51-42-13, 51-21-11 AND 51-25-16.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE FLOORBEAM TO TRANSVERSE BEAM ATTACH CLIPS ARE CRACKED IB AND OB; FS 280.00 RBL 9.0. (ITEM FOUND AT C-CHECK INSPECTION.) CLIPS REPLACED IAW CRJ SRM 51-40-11, 51-42-06, 51-23-00, 51-42-21, 51-42-13, 51-21-11 AND 51-25-16.