What was found
280 BULKHEAD, FRAME BELOW FLOOR IS CRACKED AT LBL 12.5, DISCOVERED DURING C-CHECK INSPECTION. INSTALLED REPAIR PARTS PER REO 601R 53-11-136.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
280 BULKHEAD, FRAME BELOW FLOOR IS CRACKED AT LBL 12.5, DISCOVERED DURING C-CHECK INSPECTION. INSTALLED REPAIR PARTS PER REO 601R 53-11-136.