What was found
RIGHT SIDE FLOORBEAM AT FRAME 40 FLOOR REQUIRES REPLACEMENT DUE TO CORROSION, DISCOVERED DURING C-CHECK INSPECTION. REPLACED RIGHT SIDE FLOORBEAM AT FRAME 40 PER SRM 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT SIDE FLOORBEAM AT FRAME 40 FLOOR REQUIRES REPLACEMENT DUE TO CORROSION, DISCOVERED DURING C-CHECK INSPECTION. REPLACED RIGHT SIDE FLOORBEAM AT FRAME 40 PER SRM 51-40-02.