What was found
FLOOR SUPPORT BEAM LBL 9 IN BETWEEN FS 589 AND FS 605 BLEND OUT IS OUT OF LIMIT. (C-CHECK) REPLACED FLOOR SUPPORT BEAM LBL 9 IN BETWEEN FS 569 AND FS 621 PER CRJ-200 SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOOR SUPPORT BEAM LBL 9 IN BETWEEN FS 589 AND FS 605 BLEND OUT IS OUT OF LIMIT. (C-CHECK) REPLACED FLOOR SUPPORT BEAM LBL 9 IN BETWEEN FS 569 AND FS 621 PER CRJ-200 SRM.