What was found
EIGHTEEN (18) CRACKS NOTED ON AFT PRESSURE BULKHEAD AT THE FOLLOWING LOCATIONS - LBL 36 (1), LBL 27.7 (2), LBL 18.0 (1), LBL 9.0 (3), BL 0.0 (4), RBL 9.0 (2), RBL 18.0 (2) AND RBL 27.5 (3). (C-CHECK) REPAIRED CRACKS ON AFT PRESSURE BULKHEAD AT THE FOLLOWING LOCATIONS: 1 CRACK AT LBL 36.00", 2 CRACKS AT LBL 27.70". 1 CRACK AT LBL 18.00",3 CRACKS AT LBL 9.00", 4 CRACKS AT LBL 0.00", 2 CRACKS AT RBL 9.00", 2 CRACKS AT RBL 18.00" AND 3 CRACKS AT RBL 27.50. IAW REO AND SRM.