What was found
DURING CLIMBOUT, NR 2 ENGINE ROLLED BACK TO IDLE. RETURNED TO FIELD. R & R RT ENGINE P3 LINE TO FUEL CONTROL TUBE ASSEMBLY WITH A SERVICEABLE UNIT IAW AMM. OPS CHECKED GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING CLIMBOUT, NR 2 ENGINE ROLLED BACK TO IDLE. RETURNED TO FIELD. R & R RT ENGINE P3 LINE TO FUEL CONTROL TUBE ASSEMBLY WITH A SERVICEABLE UNIT IAW AMM. OPS CHECKED GOOD.