What was found
CLIMBING THROUGH 11,000 FT, THE RT PACK CLOSED AND ACFT RETURNED TO FIELD. THE ENGINE 10TH STAGE BLEED AIR SHOWED CLOSED ON THE SYNOPTIC PAGE WITH THE SWITCH SELECTED OPEN. R & R LT PRSOV IAW AMM. OPS CHECKS GOOD. CONDUCTED POWER RUNS TO GET MANIFOLD PRESSURE TO 8.5 PSI, 10TH STAGE AND PACK OPS CHECKED GOOD. PN: 3215622-1, SN ON: 1205, SN OFF: 1692.