What was found
LBL 9 FLOOR BEAM I/B AND O/B ATTACHMENT ANGLES ARE CRACKED AT F.S. 280.00. (C-CHECK) RO: 10/16/2019 REMOVED AND REPLACED LBL 9 I/B AND O/B ANGLES AT F.S 280 IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LBL 9 FLOOR BEAM I/B AND O/B ATTACHMENT ANGLES ARE CRACKED AT F.S. 280.00. (C-CHECK) RO: 10/16/2019 REMOVED AND REPLACED LBL 9 I/B AND O/B ANGLES AT F.S 280 IAW SRM.