What was found
HYD 1 FAIL AFTER TAKEOFF. COMPLIED WITH QRH PROCEDURE. ON HYD SYNOPTIC PAGE, SYSTEM 1 SHOWED NO QUANTITY, NO TEMP, OR FLOW. PLEASE REFERENCE AML 328199 PLEASE REFERENCE AML 328200THIS DISCREPANCY WAS TRANSFERRED TO CAMP ITEM 20033850 WITH THE FOLLOWING CORRECTIVE ACTION: "TROUBLESHOT HYD 1 FAIL. FOUND #1 HYDRAULIC SYSTEM ACMP STEEL BRAIDED PRESSURE LINE DAMAGED. REMOVED AND REPLACED #1 HYDRAULIC SYSTEM ACMP STEEL BRAIDED PRESSURE LINE IAW AMM. DUE TO RETURN TO FIELD REFERENCE CAMPS CP 20035095, ML 20033851, ML 20033852 AND ML 20033853 FOR #1 HYDRAULIC SYSTEM ACMP, EDP, RESERVOIR AND ALL FILTERS CHANGED. SEE CAMP CP 20038095 FOR LEAK AND OPS CHECK."