As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RBL 9 FLOOR BEAM CAP IS CORRODED FROM F.S. 559.00+80 TO F.S. 559.00+96 (C-CHECK) RO 12/14/2019 RBL 9 FLOOR BEAM CAP FROM FS 559.00 +80 TO FS 559.00+96 WAS FOUND TO BE OUT OF ALLOWABLE LIMITS IAW CRJ-200 SRM DUE TO THE AMOUNT AND DEPTH OF THE DAMAGE. REFERENCE WVAC JOB: 9756491 OP: 242 CO: 7564919 CAMP#19797332 FOR REPAIR OR REPLACEMENT FO THE RBL 9 FLOOR BEAM FROM FS 559.00+16 TO FS 559.00+112