What was found
LH FLAP STUB FAIRING CRACKED ON LEADING EDGE SIDE (C-CHECK) RO:12/24/2019 REPLACED LH FLAP STUB FAIRING WITH NEW FAIRING. LH FLAP STUB FAIRING IS INSTALLED ON JOB.2755581 OP.96 MX.19844954. SEE CONTINUATION FOR DETAILS
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LH FLAP STUB FAIRING CRACKED ON LEADING EDGE SIDE (C-CHECK) RO:12/24/2019 REPLACED LH FLAP STUB FAIRING WITH NEW FAIRING. LH FLAP STUB FAIRING IS INSTALLED ON JOB.2755581 OP.96 MX.19844954. SEE CONTINUATION FOR DETAILS