As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
* FS 409+128 VERTICAL POST OUTBOARD HALF HAS A SUSPECTED CRACK AT RBL 18, NEAR THE LOWER END'S FASTENER. (C-CHECK) RO 12/27/2019 REMOVED CRACK OUTBD POST AND INSTALLED NEW P/N 601R32208-30 VERTICAL OUTBD POST RBL18 AT FS409+128 REF BOMBARDIER REO AND BOMBARDIER DWG. PRESSURIZATION LEAK CHECK WAS GOOD. COMPLIED WITH SKYWEST TASK CARD