What was found
AFT PRESSURE BULKHEAD- GOUGED RBL 27.50 30" ABOVE FLOOR (C-CHECK) RO 12/31/2019 DAMAGE FOUND TO BE OUT OF LIMITS PERFORMED CUTOUT AND MANUFACTURED AND INSTALLED REPAIR DOUBLERS ON AFT PRESSURE BULKHEAD AT RBL 27.50 30" ABOVE FLOOR IAW BOMBARDIER REO. ACCOMPLSHED HFEC PER CRJ 200 NTM. NO DEFECTS NOTED. ACCOMPLISED U/T THICKNESS CRJ200 NTM. OLYMPUS 600 NORTEC, AV8958 CAL DUE: JULY, 2020. OLYMPUS 605 EPOC AV8959 CAL DUE: JULY,2020. PRESSURIZATION LEAK CHECK: GOOD / ** REF M337- WEIGHT NEGLGIBLE** / ** REF REO FOR IN SERVICE REINSPECTION REQUIREMENTS.**