What was found
*PRESSURE FLOOR BEAM CHANNEL CORROSION FS409.00+128 €“ 559.00 RBL 9(L) (MARKED) (C CHECK) RO 3/7/2020 REMOVED CORROSION FROM PRESSURE FLOOR BEAM CHANNEL BETWEEN FS409.00+128 AND FS559.00 RBL9 REF CRJ 200 SRM. EVALUATED AND FOUND TO BE OUT OF LIMITS, REF BOMBARDIER DWG AND BOMBARDIER REO. REMOVED AND REPLACED RH FLOOR BEAM CAP AT RBL9 FROM FS 409.00+128 TO FS 559.00 REF BOMBARDIER REO. SEE CONTINUATION CARD FOR DETAILS.