What was found
COMPLY WITH SCHEDULED MAINTENANCE CODE: AD - COMPLY WITH PARAGRAPH (J) OF AD BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION (FS) 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO). AND MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE, PART NUMBER: - , SERIAL NUMBER: 7850, POSITION: (C-CHECK) RO 3/25/2020 COMPLIED WITH PARAGRAPH (J) OF AD BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION (FS) 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO). AND;MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE.COMPLIED WITH SERIAL NUMBER 7850. REPAIRED FS 621 BULKHEAD REF REO. COMPLIED WITH SKYWEST TASK CARD. AND SEE CONTINUATION CARD FOR DETAILS