As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FS 280 FLOOR BEAM ANGLES OUTBD OF LBL 9.0 AND RBL 9.0 ARE CRACKED. (C-CHECK) RO 5/19/2020 FABRICATED AND INSTALLED REPAIR CLIPS IAW BOMBARDIER REPAIR ENGINEERING ORDER. PART FOR PART REPLACEMENT, ZERO WEIGHT CHANGE. STRUCTURAL REPAIR RII TASK COMPLETED, FORM M-337 GENERATED.