As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RBL 9 FLOOR BEAM CAP IS CORRODED BETWEEN FS 409+128 TO FS 513. C-CHECK RO 10/1/2020. REPAIRED RBL 9 FLOOR BEAM CAP AT FS 409+128 TO FS 513.00, IAW MHIRJ REO AND SRM. COMPLETED TASK CARD AND ATTACHED COMPLETED FORM 337. NO WEIGHT CHANGE. SEE CONTINUATION CARD FOR DETAILS OF WORK PERFORMED.