What was found
RT FLAP STUB FAIRING HAS GOUGE ALONG BOTTOM LENGTH OF FAIRING AND FORWARD HINGE HALF HAS BROKEN NUTPLATE. C-CHECK RO 10/13/2020. REPLACED WITH NEW RT FLAP STUB FAIRING ASSEMBLY, REF CRJ 200 SRM. SEE CONTINUATION CARD FOR DETAILS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RT FLAP STUB FAIRING HAS GOUGE ALONG BOTTOM LENGTH OF FAIRING AND FORWARD HINGE HALF HAS BROKEN NUTPLATE. C-CHECK RO 10/13/2020. REPLACED WITH NEW RT FLAP STUB FAIRING ASSEMBLY, REF CRJ 200 SRM. SEE CONTINUATION CARD FOR DETAILS.