What was found
COMPLY WITH SCHEDULED MAINTENANCE CODE: AD-COMPLY WITH PARAGRAPH (J) OF AD: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION FS 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO) AND MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE, PART NUMBER: -, SERIAL NUMBER: 7822, POSITION. C-CHECK RO 10/18/2020. COMPLIED WITH PARAGRAPH (J) OF AD BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION FS 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO). AND; MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE. COMPLIED WITH SERIAL NUMBER 7822. COMPLETED MAJOR REPAIR TASK AND FORM M337. REFER TO CONTINUE CARD FOR WORK PERFORMED. WEIGHT CHANGE DOCUMENTED ON CONTINUE CARD.