What was found
EVALUATE CENTER 9G BULKHEAD AFT SIDE DAMAGE AT INSERT/RIV NUT LOCATIONS, REFERENCE RIL 5378. REPAIR IF NEEDED, IAW ENGINEERING INSTRUCTIONS. C-CHECK RO 10/18/2020. COMPLIED WITH MHIRJ EO IN REPAIR OF TOOLING DAMAGE TO CENTER 9G BULKHEAD AFT WALL. REPAIR DOUBLER MATERIAL 2024-T3 .040 P/O W58363. DEPTH GAGE WVACT 204441 CAL DUE 28 FEB 2021. COMPLETED TASK CARD, FORM M-337 ATTACHED. NO WEIGHT REMOVED, TOTAL WEIGHT ADDED .826 LBS.