Service difficulty report · Hinge Arm · Cndair CL6002B19

Difficulty date
September 11, 2020
Submitted
October 23, 2020
Operation
Air carrier
Aircraft
N919EV
Make and model
Cndair CL6002B19
Aircraft serial
7780
Aircraft time
34,282 hours, 34,200 cycles
Part
Hinge Arm
Condition
Chafed
Location
Lt Wing Te Flap
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEFT OUTBOARD FLAP CENTER HINGE ARM CHAFED ON OUTBOARD SIDE NEAR ATTACHMENT TO HINGE BOX. C-CHECK RO 10/20/2020. BLENDED OUT CHAFE ON LEFT OUTBOARD FLAP CENTER HINGE ARM ON OUTBOARD SIDE NEAR ATTACHMENT TO HINGE BOX, IAW CRJ200 SRM. BLENDED AREA FOUND TO BE OUT OF LIMITS AND REPAIRED LT OUTBOARD FLAP CENTER HINGE ARM, REF REO. SEE CONTINUATION CARD FOR DETAIL.