As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FUSELAGE PAX DOOR HINGE HALF AFT MOST LANDING IS GOUGED. C-CHECK RO 11/12/2020. REPAIRED FUSELAGE PAX DOOR HINGE HALF AFT MOST LANDING, IAW BOMBARDIER REO. MAJOR REPAIR TASK & FORM M-337 COMPLETED. NO WEIGHT CHANGE REQUIRED. DETAILED VISUAL INSPECTION DUE AT 31946 FLIGHT CYCLES WITH A REINSPECT EVERY 5700 FLIGHT CYCLES, REF ATTACHED CONTUATION CARD FOR DETAILS OF WORK PERFORMED.