What was found
COMPLY WITH SCHEDULED MAINTENANCE CODE: AD-COMPLY WITH PARAGRAPH (J) OF AD BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION FS 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL OF BOMBARDIER. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REO AND MARKING THIS CAMP AS "STRUCTURAL REPAIR." WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE, PART NUMBER: -, SERIAL NUMBER: 7892, POSITION. C-CHECK RO 11/21/2020. COMPLIED WITH PARAGRAPH (J) OF AD BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION FS 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL OF BOMBARDIER TR. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REO AND MARKING THIS CAMP AS "STRUCTURAL REPAIR." WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE. COMPLIED WITH SERIAL NUMBER 7892. COMPLIED WITH REO. COMPLIED WITH ALL APPLICABLE STEPS OF REO. COMPLIED WITH SKYWEST TASK CARD. LEAK CHECKS GOOD.