As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RBL 9 FLOOR BEAM IS CORRODED BETWEEN FS 409+52 AND FS 409+128. C-CHECK RO 11/24/2020. PERFORMED MAJOR REPAIR ON RBL 9 FLOORBEAM CAP BETWEEN FS 409+48.00 AND FS 409+118.00, IAW CRJ200 SRM AND MHIRJ REO. COMPLETED TASK CARD FOR STRUCTURAL MAJOR REPAIR. FORM M-337 ATTACHED. WEIGHT CHANGE NEGLIGABLE.