What was found
LBL 9 FLOOR BEAM OB CLIP AT FS 280 IS CRACKED. C-CHECK RO 12/04/2020. REMOVED DAMAGED CLIP ON LBL 9 FLOOR BEAM ATTACHED TO FS 280 AND INSTALLED NEW SERVICEABLE CLIP, IAW REO, AND CRJ200-SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LBL 9 FLOOR BEAM OB CLIP AT FS 280 IS CRACKED. C-CHECK RO 12/04/2020. REMOVED DAMAGED CLIP ON LBL 9 FLOOR BEAM ATTACHED TO FS 280 AND INSTALLED NEW SERVICEABLE CLIP, IAW REO, AND CRJ200-SRM.