Service difficulty report · Pressure Deck · Cndair CL6002B19
FAA SDR system
- Difficulty date
- December 6, 2020
- Submitted
- February 2, 2021
- Operation
- Air carrier
- Make and model
- Cndair CL6002B19
- Aircraft serial
- 7677
- Aircraft time
- 39,109 hours, 34,905 cycles
- Part
- Pressure Deck
- Condition
- Corroded
- Stage of operation
- IN
- How discovered
- 9
- Nature of condition
- O
- Precautionary procedure
- K
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
* RH UPPER SURFACE OF PRESSURE FLOOR SILL HAS MULTIBLE AREA'S OF CORROSION. CIRCLED WITH GREASE PENCIL (C-CHECK) RO 1/29/2021 REMOVED CORROSION FROM RH UPPER SURFACE OF PRESSURE FLOOR SILL PANEL TO ACCEPTABLE LIMITS REF. REO 601R-53-41-666 REV. C DATED 2012-11-06, REO 601R-53-41-2832 REV-- DATED 2020-12-23. COMPLIED WITH ST 51-900-1003-SKY. PRESSURE CHECKS GOOD.