As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
*FASTENERS IN THE "SHIM" ON FLOOR CROSSBEAM AT FS349, BETWEEN LBL27 AND THE LH FLOOR SILL HAVE CORROSION. (MARKED) (C-CHECK RO 8/1/2021) REMOVED AND REPLACED 4EA FASTENERS IN THE "SHIM" ON FLOOR CROSSBEAM AT FS349, BETWEEN LBL27 AND THE LH FLOOR SILL CRJ200 SRM 51-42-13