What was found
COMPLY WITH SCHEDULED MAINTENANCE CODE: AD 2019-08-04/02 40000 FC - COMPLY WITH PARAGRAPH (J) OF AD 2019-08-04 BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION (FS) 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL 53-61-153 OF BOMBARDIER TR 2B-2187, DATED JUNE 22, 2011, TO APPENDIX B€“AIRWORTHINESS LIMITATIONS, OF PART 2 OF THE BOMBARDIER CL-600-2B19 MRM. (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO) 601R-53-61-1240, REVISION D, DATED OCTOBER 31, 2016. AND MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE, PART NUMBER: - , SERIAL NUMBER: 7776, POSITION: COMPLIED WITH PARAGRAPH (J) OF AD 2019-08-04 BY: (J)(1) DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FORWARD FACE OF THE FUSELAGE STATION (FS) 621 PRESSURE BULKHEAD, IN ACCORDANCE WITH AWL 53-61-153 OF BOMBARDIER TR 2B-2187, DATED JUNE 22, 2011, TO APPENDIX B€“AIRWORTHINESS LIMITATIONS, OF PART 2 OF THE BOMBARDIER CL-600-2B19 MRM. / REPAIRED 621 PRESSURE BULKHEAD REF REO 601R-53-61-1240 REV -D, DATED 2016-10-31, CRJ-200-SRM 51-42-06, CRJ-200-SRM 51-42-21, AND CRJ-200-SRM 51-42-22. COMPLIED WITH 51-900-1003-SKY AND SEE CONTINUATION CARD FOR DETAILS / (J)(2) MODIFYING THE RPB AND DOING A NONDESTRUCTIVE INSPECTION FOR CRACKING OF THE FS 621 PRESSURE BULKHEAD WEB, IN ACCORDANCE WITH BOMBARDIER REPAIR ENGINEERING ORDER (REO) 601R-53-61-1240, REVISION D, DATED OCTOBER 31, 2016. AND; MARKING THIS CAMP AS "STRUCTURAL REPAIR," WHICH WILL GENERATE AN RA FOR TRACKING THE SDIR FOR THIS REO ON THIS AIRPLANE. / COMPLIED WITH SERIAL NUMBER 7776. (C-CHECK RO 10/8/2021)