What was found
FLOOR SUPPORT STRUCTURE AT FS280 AND BETWEEN RBL9 AND LBL9 "J"ANGLE CRACKED. (C-CHECK RO 1/5/2022) REMOVED AND REPLACED FLOOR SUPPORT STRUCTURE AT FS280 AND BETWEEN RBL9 AND LBL9 AFT "J"ANGLE AND RH REPAIR SPLICE IAW CRJ 200 SRM 51-42-06, 51-42-21, 51-41-02. FORM 337 AND MAJOR REPAIR TASK CARD 51-900-1003-SKY COMPLETED AND ATTACHED. NO WEIGHT CHANGE NOTED. REFERENCE ATTACHED TASK AND CONTINUE CARD FOR DETAILS OF WORK PERFORMED